Commercial

Purpose-built
for the way you operate.

Compliance-driven commercial construction across Victoria — SDA housing, childcare and medical centres, tilt-slab industrial, retail and office fitouts, and aged care — each delivered end-to-end under a single fixed-price head contract.

Fixed-price head contract

One contract, one price — from earthworks to occupancy.

Compliance in-house

NDIS, DET, DDA, AS 1668, AS 1170 coordinated by our team.

Staged handover ready

Live tenancies, staged occupancy and after-hours works.

Sectors we build

Seven sectors, one delivery model.

NDIS / Specialist Disability Accommodation (SDA)

C01 · Improved Liveability · Fully Accessible · Robust · High Physical Support

NDIS / Specialist Disability Accommodation (SDA)

Purpose-built SDA dwellings designed and constructed to the NDIS SDA Design Standard. We manage the complete compliance chain — SDA design category certification, NCC 2022, DDA, energy, acoustic and enrolment paperwork — so providers can focus on residents from day one.

Typical scale

Villas, duplexes, apartments — 1 to 5 residents

Timeline

10 — 14 months from contract

Included as standard

  • Certified SDA design (all four categories)
  • Occupational therapist consultation
  • Assistive technology pre-wiring
  • Reinforced walls & ceiling hoists (Robust / HPS)
  • Backup power & emergency systems
  • SDA provider enrolment support
Enquire about this sector →
Childcare Centres

C02 · DET-compliant early learning environments

Childcare Centres

Ground-up early learning centres and long-day care facilities across Victoria. Every project meets the Education and Care Services National Regulations and the Department of Education's design standards — including acoustic zoning, natural light, outdoor play integration and commercial kitchen certification.

Typical scale

40 — 120 places · 800 — 1,800 m²

Timeline

10 — 14 months from contract

Included as standard

  • DET design standard compliance
  • Acoustic zoning & mechanical ventilation
  • Commercial kitchen (food-safe certification)
  • Outdoor play & shade structures
  • Nappy change, sleep & staff amenities
  • Fire, lockdown & evacuation systems
Enquire about this sector →
Medical Centres

C03 · GP · Allied health · Day surgery fitouts

Medical Centres

Ground-up medical centres and clinical fitouts for GPs, dentists, specialists and allied health practices. Infection-control finishes, DDA-accessible circulation, dedicated clinical waste and mechanical services engineered to AS 1668 — with minimum disruption to trading tenancies.

Typical scale

6 — 20 consult rooms · 300 — 1,200 m²

Timeline

6 — 12 months from contract

Included as standard

  • AS/NZS 4187 clean-zone finishes
  • DDA-compliant access & bathrooms
  • Mechanical ventilation (AS 1668)
  • Nurse call & patient security systems
  • Clinical waste & sharps handling
  • After-hours & staged construction
Enquire about this sector →
Warehouses & Light Industrial

C04 · Tilt-slab · Portal-frame · Office fitout

Warehouses & Light Industrial

Tilt-slab warehouses, portal-frame sheds and light-industrial facilities for owner-occupiers and investors across Geelong, Melbourne's west and regional Victoria. We deliver the full package — earthworks, hardstand, structure, office fitout and civil — as a single fixed-price contract.

Typical scale

500 — 8,000 m² GFA

Timeline

6 — 12 months from slab

Included as standard

  • Civil works, hardstand & drainage
  • Tilt-slab or portal-frame structure
  • Insulated roof & wall systems
  • Office & amenities fitout
  • 3-phase power & data infrastructure
  • Compliance with AS 1170 & AS 3600
Enquire about this sector →
Retail & Hospitality Fitouts

C05 · Cafes · Restaurants · Shops

Retail & Hospitality Fitouts

End-to-end retail and hospitality fitouts — from a boutique shopfront to a full hospitality venue. We manage landlord approvals, food-safe kitchens, grease traps, mechanical exhaust, POS and AV integration so operators can open on schedule.

Typical scale

80 — 600 m² tenancies

Timeline

8 — 20 weeks from access

Included as standard

  • Landlord & centre-management liaison
  • Food-safe commercial kitchens
  • Grease trap & mechanical exhaust
  • POS, AV & data infrastructure
  • Joinery & bespoke shopfront
  • After-hours & staged works
Enquire about this sector →
Office & Corporate Fitouts

C06 · Commercial tenancies · Breakout · Meeting AV

Office & Corporate Fitouts

Corporate tenancy fitouts built around how teams actually work — quiet zones, collaboration hubs, meeting-room AV and end-of-trip amenities. We deliver Cat A shells and complete Cat B fitouts to commercial-grade acoustic and DDA standards.

Typical scale

200 — 2,500 m² tenancies

Timeline

10 — 20 weeks from access

Included as standard

  • Acoustic zoning & partitioning
  • Meeting room AV & video conferencing
  • DDA-compliant access & amenities
  • Breakout kitchens & end-of-trip
  • Data, power & cable management
  • Base-building services coordination
Enquire about this sector →
Aged Care & Retirement Living

C07 · Residential care · Independent living

Aged Care & Retirement Living

Purpose-built aged care residences and independent living units designed around resident dignity and staff efficiency. We deliver to the Aged Care Quality Standards with nurse call, accessible bathrooms, dementia-friendly wayfinding and generous natural light.

Typical scale

20 — 120 beds · 2,000 — 8,000 m²

Timeline

14 — 22 months from contract

Included as standard

  • Aged Care Quality Standards compliance
  • Nurse call & emergency systems
  • Accessible bathrooms & assisted showers
  • Dementia-friendly wayfinding
  • Commercial kitchen & laundry
  • Generator & fire-rated construction
Enquire about this sector →

How we work

From feasibility to occupancy.

1 · Feasibility

Site due diligence, yield and cost-plan review, compliance pathway mapped up front.

2 · Design & approvals

Architecture, engineering, town planning and building permits coordinated in-house.

3 · Head contract

Fixed-price head contract with a nominated project manager and transparent provisional sums.

4 · Staged handover

Weekly reporting, essential-services certification, staged occupancy and defects liability.

Compliance

Standards we build to.

  • NCC 2022 & essential services
  • DDA & AS 1428 accessibility
  • AS 1668 mechanical ventilation
  • AS 1170 / AS 3600 structural
  • NDIS SDA Design Standard
  • DET childcare design standard
  • AS/NZS 4187 clean zones
  • Aged Care Quality Standards

Frequently asked

Questions we hear most.

Talk to our commercial team

Bring us your brief.

A 60-minute session with a project manager is enough to sketch a realistic budget, program and compliance path before you commit to anything.